Every circuit we touch gets written into the panel directory · (000) 000-0000

Electrician Medina WA
Wooden house frame under construction

New Builds

New Construction Wiring in Medina, WA

On a new build everything can be done the way it should be, which makes planning matter more than installation. Discuss the drawings on (000) 000-0000.

Have it estimated free — (000) 000-0000

Circuit counts, lighting layouts, panel position and capacity for what gets added later are nearly free at design stage and expensive to revisit afterwards. On larger lots there is usually a second conversation about feeds to a detached garage, a pool house or a gate, which is far easier to allow for before anything is backfilled.

How it runs

What the job looks like

01

Price from the drawings

A take-off rather than an estimate, so the number means something.

02

Temporary power, service, rough-in

Set out for each inspection stage rather than chased.

03

Trim and hand over

Everything tested, labelled and documented.

Detail

What we watch for

  • Capacity allowed for later — chargers, heat pumps and outbuilding circuits planned now
  • Lighting designed room by room — switching laid out for how the room is used
  • Inspection stages booked — temporary power, rough-in and final
  • Panel sited sensibly — reachable, not behind a future wardrobe
Wooden house frame under construction

Book a free in-home estimate — (000) 000-0000

Questions

Asked often

How early should we talk?

As soon as drawings exist. Panel location, service size and circuit count cost almost nothing to decide on paper and a great deal once framing is up.

Do you arrange temporary site power?

Yes, on most builds it is part of our scope, including coordinating its inspection so the other trades have power when they need it.

Have it looked at before you commit

Describe the job on the phone and we will say what is involved and whether it needs a visit to price properly.

Get a date in the diary — (000) 000-0000